The bidding ceiling price of the project will be set (the ceiling price includes the ceiling price of the total bid price and the ceiling price of the comprehensive unit price of the corresponding bill of quantities).
2、 Source of funds
The bidder shall raise funds by himself.
3、 Qualification requirements for bidders
(1) Basic qualifications
1. Having the ability to bear civil liability independently;
2. Have the necessary equipment and professional technical ability to perform the contract;
3. Other conditions stipulated by laws and administrative regulations.
(2) Specific qualifications
1. The bidder shall have valid qualification certificate for environmental pollution control.
2. The bidder must have valid ISO9001 quality management system certificate, valid ISO14001 environmental management system certificate and valid ISO18001 occupational health management system certificate;
3. The bidder must be a unit with the license of interior decoration design and construction business scope or a unit with the installation of kitchen production equipment.
4. The project does not accept the consortium bidding.
(copies of the above supporting materials shall be stamped with the fresh seal of the bidder, and the original shall be inspected on site.)
4、 Instructions for bidding and opening
(1) This tender does not provide paper tender documents, but only electronic tender documents to be sent to the bidder.
(2) The bidder must meet the following two requirements before its bid can be accepted
1. Submitted the tender documents on time;
2. Sign in on time.
(3) Tender issuing time: 09:00-18:00, July 17, 2019 to July 17, 2019
(4) Bidding start time: 8:00, July 22, 2019
(5) Deadline for bidding: 14:30, August 5, 2019
(6) Place of bid opening: conference room, third floor, degan base, Jihua 3539 Shoes Co., Ltd
(7) Time of bid opening: 14:30, August 5, 2019
5、 Bid security
(1) Tender bond submission
The bidder shall pay the amount of the bid security specified in the project (see part I of this chapter for the amount of the bid security). The bidder shall remit the bid security from its basic account to the following account. The deadline for the receipt of the bid security is 10:30 on the day of bid opening.
Deposit account
Account Name: Jihua 3539 shoemaking Co., Ltd
Bank of deposit: ICBC Chongqing Jijiang sub branch
Account No.: 3100092006109
1. All bidders shall fully consider the time difference risk of bank transfer (telegraphic transfer) when making bank transfer (telegraphic transfer), such as the time requirement of city transfer, remote transfer or remittance, inter-bank transfer or telegraphic transfer.
2. Before the bid opening, each bidder must submit the copy of the payment form of the bid security and the license for opening the basic bank account on site (the original copy for future reference), and the payer must be consistent with the bidder, otherwise it will be deemed as invalid response document.
3. When submitting the bid security, the receiving account shall be the special account for bid security specified above, and the receiving account shall be the basic account of the company.
(2) Deposit refund method
1. The deposit of the unsuccessful bidder shall be returned directly by the bid inviting party according to the payment channel within five working days after the issuance of the letter of acceptance.
2. The bid security of the successful bidder will be automatically converted into the performance security after the successful bidder signs the contract with the bid inviting party. The balance of the performance security of 10000 yuan shall be fully paid to the bid inviting party before signing the contract. The performance bond shall be returned directly according to the fund channel within five working days after the project is completed and accepted and the project final accounts audit report is issued.
Telephone number of Finance Department of Jihua 3539 shoemaking Co., Ltd. (023) 47556981
6、 Regulations on Bidding
(1) The supplementary documents (if any) of this project shall be issued by the logistics support department of Jihua 3539 shoemaking Co., Ltd. all bidders shall pay attention to ensure the smooth contact information;
(2) Tender documents submitted beyond the deadline will not be accepted.
(3) Bidding fee: no matter what the bidding result is, all the expenses of the bidder participating in the project bidding shall be borne by the bidder.
(4) Each bidder shall conduct his own site survey in order to obtain all the data required for the preparation of bidding documents and signing of the contract for the project. The expenses incurred in site survey shall be borne by the bidder. Once the bidder wins the bid, the bidder shall not ask for additional compensation or extension of construction period on the pretext of not fully understanding the construction site conditions.
7、 Other instructions
The description of "project characteristics and work content" in the bill of quantities is not the only basis for bidding quotation. The bidder shall also combine the instructions to bidders, general conditions of contract, special conditions of contract, technical standards and requirements, and other information in the bidding document Fully understand the bidding drawings and the investigation of the site, and offer the bidding price for each part of the bill of quantities;
The bidder shall quote in strict accordance with the requirements of the bill of quantities and the bidding document provided by the bidder, and must list the comprehensive unit price analysis table of the bill of quantities of each sub project and the list of construction technical measures (if any), so as to be regarded as the overall quotation is complete, otherwise it will be regarded as not making substantive response to the bidding document, and its bidding document will be rejected. If the quotation is blank or zero, it shall be deemed that the price of the sub item has been included in the unit price and total price of other sub items in the bill of quantities. After winning the bid, the work content of the sub item must be completed, and the bid inviting party will not settle and pay for the sub item. In the construction process, if it is necessary to reduce or refuse to implement the project with blank quotation or zero quotation due to the reasons of the bid inviting party, the bid inviting party will calculate the comprehensive unit price of the project and the corresponding fees, measure project fees and taxes according to the pricing principle at the time of bidding quotation, and deduct them from the settlement price accordingly.
8、 After receiving this invitation to bid, all inviting units shall confirm it by fax or e-mail before 16:00 on July 22, 2019. If it is not confirmed within the specified time, it will be regarded as abandoning the bid. Fax: 023-47523038.
9、 Contact information
(1) Bid inviting party: Jihua 3539 shoemaking Co., Ltd
Contact person: Mr. Yang
Tel: 17782001522